BidQuota Docs
Help

Glossary

Plain-English definitions for the terms used in Bid Quota.

Use this page when an app label or estimating term is unfamiliar. For a first project, follow Getting started.

TermMeaning
AddendumA formally issued change or clarification to the bid documents. Check that your set includes the relevant addenda.
AgentSaved instructions for a repeatable assistant task. Choose one with @ in Chat.
AI creditsUnits used for assistant replies and generation. Included credits follow the plan's displayed billing period.
AllowanceAn amount carried for work that cannot yet be priced firmly. Review the suggested basis and risk.
AssumptionSomething your price depends on being true, such as stated access hours.
Bid packageThe reviewed estimate and related bid documents offered as separate downloads.
Billing periodThe subscription period used for plan allowances and renewal. Check the dates shown in the app.
ConfidenceAn indication of how cautiously to treat a reading. Low-confidence evidence needs visual verification.
ContingencyAn estimate provision for uncertainty, controlled with a percentage in the estimate.
CSI divisionA construction work category used to organize scope and estimate lines.
EstimateSaved project line items, quantities, prices, markups, and totals.
EvidenceThe source reference and exact quoted text supporting a project fact.
ExclusionWork or a condition expressly left out of your price.
File referenceA selected uploaded file that helps focus a chat question; choose it with /.
InclusionWork expressly covered by your price.
Line itemOne separately described and priced piece of the estimate.
Member capA limit on a person's use of shared organization credits. It differs from the organization's total balance.
OCR / text recognitionReading text from scanned pages or drawing images. These readings are treated as low confidence.
OrganizationA shared workspace with an owner, members, and its own plan.
OverheadCosts of running and supporting the work, represented by a markup control in the estimate.
OwnerThe person with control of the workspace's billing, team, and owner-only actions.
Pending invitationAn invitation not yet accepted. A live invitation reserves a seat.
Personal workspaceYour own workspace, separate from team organizations. It cannot have invited teammates.
ProfitThe margin represented by the profit markup control in the estimate.
ProposalClient-facing scope, exclusions, assumptions, qualifications, and terms prepared for the bid.
QualificationA condition attached to the offer, such as a limit on how long the price is valid.
Quantity takeoffMeasuring and counting work from drawings. Bid Quota reads stated values but does not measure drawing geometry.
RFIRequest for Information: a question seeking clarification of missing or conflicting project information.
Schedule of ValuesAn organized breakdown of the estimate's value for review or payment planning.
Scope gapWork referred to in the documents but not sufficiently specified to price confidently.
SeatA place in an organization. Owners, accepted members, and active pending invitations count toward capacity.
SheetA drawing's printed identifier, or a worksheet within a spreadsheet, depending on the source.
Unit rateThe price per unit of work, multiplied by quantity to price a line.
WorkspaceThe personal or organization area that owns a set of projects, agents, and plan limits.

Check the original unit

A number without its unit can mislead. Keep the printed unit with the value, and verify any conversion before pricing.